The ISTQB CT-TAE (Certified Tester Test Automation Engineer) certification exam is a globally recognized certification that focuses on test automation. This certification is designed for individuals who have a strong understanding of software testing principles and techniques, and who are looking to specialize in test automation. The CT-TAE certification exam tests an individual's knowledge and skills in areas such as test automation design, development, and maintenance.

 

NEW QUESTION # 23
What represents good practice when automating a manual regression test suite?

  • A. All existing manual tests should be decomposed into several smaller automated tests to reduce functional overlap.
  • B. Once a manual test has been automated, execute it immediately to Identify whether it operates correctly.
  • C. Test data shared between tests should, where feasible, be stored and accessed from a single source to avoid duplication or introduction of error.
  • D. Remove inter-dependencies between tests to reduce automation failures and costly error analysis.

Answer: B


NEW QUESTION # 24
Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

  • A. All the interface of the SUT affected by the tests should be controllable by the TAA
  • B. All the external test interfaces of the SUT should be removed prior to the product release
  • C. All the interaction between SUT and TAS should be logged with the highest level of detail
  • D. All the internal test interfaces of the SUT should be removed prior to the product release

Answer: C


NEW QUESTION # 25
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

  • A. The ability of the SUT to prevent unauthorized access to its components or data.
  • B. The ability of the SUT to perform its intended function for a specified period of time
  • C. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
  • D. The ability to identify states, outputs, intermediate result and error messages in the SUT

Answer: D


NEW QUESTION # 26
A major component of your organisation's Test Automaton Solution (TAS) is a popular open-source third-party capture-replay tool for automated functional testing.
Which two of the following must the Test Automation Engineer (TAE) ensure happens for this TAS?
a) The third party tool is placed under configuration management control.
b) The annual support and maintenance costs are agreed with the tool's vendor.
c) It is Important to obtain information about updates and new versions of the tool so that the third party tool is kept up to date.
d) Ensure that the TAS test scripts are integrated into the tool's framework.
e) Ensure that no changes are made to the tool, because modifications are not allowed for third party products.

  • A. d and e
  • B. a and c
  • C. a and b
  • D. c and d

Answer: C


NEW QUESTION # 27
A TAS uses a commercial test automation tool and the default logs generated by the inconsistent formats such as different types of messages (pass/fail steps, screenshots, warnings, etc.) To solve this issue some custom logging functions have been created from the test scripts, making it possible to log the different types of messages with the same format. However, this may cause a problem due to excessive size of the logs which can make it difficult to find the required information. Assume that all the default logs will be disabled when running the automated tests and that some tests will not generate excessively sized logs.
Which of the following represents the BEST suggestion for implementing the custom logging functions?

  • A. Implement the custom logging functions without saving timestamps
  • B. Implement the custom logging functions without saving stack traces
  • C. Implement the custom logging functions to support different levels of tracing
  • D. Implement the custom logging functions to redirect the logs to multiple files

Answer: C


NEW QUESTION # 28
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?

  • A. Complexity to automate
  • B. Sustainability of the automated environment
  • C. Frequency of use
  • D. Maturity of the test process

Answer: B


NEW QUESTION # 29
Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

  • A. Establishing an error recovery process for TAS and SUT
  • B. Implementing keywords with a higher level of granularity
  • C. Changing the scripting approach to data-driven scripting
  • D. Changing the wait mechanism to explicit hard-coded waits

Answer: D


NEW QUESTION # 30
You have been asked to develop test automation for a legacy system that is going to go through a series of infrastructure migrations. The scripts will be used to verify basic functionality during these infrastructure changes Your Test Analysts have some programming skills and need a solution that is simple and fast.
Maintainability of the scripts is not a consideration because no changes to the software are anticipated.
Which of the following is the BEST scripting approach in this situation?

  • A. Linear scripting
  • B. Model-Based scripting
  • C. Structured scripting
  • D. Capture-replay scripting

Answer: D


NEW QUESTION # 31
You are a TAE working for a software house which provides quarterly releases of its software to its customers. There are many different versions of the SUT that need to be tested simultaneously by different tests teams.
Your TAS is complex and you need to ensure it remains consistent across the different SUT environments. What is the BEST and MOST efficient way to ensure each of the test teams use the same version of the TAS to test the different versions of the SUT?

  • A. Develop a tool to track historical test results across the different SUT environments and look for trends.
  • B. Produce comprehensive documentation of the TAS, installation and usage guidelines and provide training for each team member.
  • C. Due to the complexities involved and the high risks associated with these releases, it would be best to revert to manual testing.
  • D. Install the TAS is a central repository and have an automated installation and configuration of the TAS from this repository to each of the SUT environments.

Answer: D


NEW QUESTION # 32
You have investigated a new tool which enables the modelling of the SUT and can then generate test cases either manually or automatically. You have convinced your managers that the best way forward is to conduct a pilot project for this tool. You need to select a project to use for the pilot. You have the choice of the following projects:
Project A: A two-year project that is critical to the business and is currently in the requirement phase. This project is for a new e-commerce web site and is mostly being developed "in-house" although the payment system is being developed and delivered by a 3rd party provider.
Project B: A safety critical application for software to drive and park cars.
Project C: An upgrade to an important HR timesheet tracking application that will be available on a desktop and mobile application. This is a 1-month project developed in-house.
Project D The payment system from project A.
Which project would be BEST for the pilot?

  • A. Project C because it is a short, low priority project but is important.
  • B. Project A because it is a large project and has high visibility and is in the requirement phase.
  • C. Project D because it is a small part of a larger project and will help show the tool's capabilities.
  • D. Project B because it is a safety critical system and has high visibility.

Answer: C


NEW QUESTION # 33
As the TAE, you are working with the organisation's Test Manager to decide which external metrics and which internal metrics should be gathered for the new TAS.
Which of the following represents the BEST internal metric that would help measure the quality of the TAS and the number of problems associated with the TAS?

  • A. A measure of how many automated tests pass and fail
  • B. A measure of defect density within the TAS automation code
  • C. The number of hours of manual test effort saved by implementing a TAS
  • D. The average maintenance cost to keep an automated test in sync with the SUT

Answer: B


NEW QUESTION # 34
You are testing a major enhancement to an air traffic control user interface. You have use of a sophisticated pre-production test environment, created specifically for large scale automated regression, performance and security testing. The window for regression testing is limited and must successfully conclude, with no major regressions remaining, before the non-functional testing starts.
You have been using the same version of the TAS for the last few releases, each time completing the automated regression test suite in a single overnight run. However, due to the latest enhancements for the SUT, you believe there is a risk that the test suite may no longer complete overnight and therefore delay performance and security testing.
Which option would be the BEST and MOST cost-efficient approach to mitigate this risk?

  • A. Split the regression test suite into multiple parts, running in the environment across consecutive nights.
  • B. Create a mirror of the pre-production test environment and split the regression test suite to run in parallel across the environments.
  • C. Introduce better coding practices for the automation scripts, including coding guidelines, reviews and improved static analysis.
  • D. Analyse the regression test suite and remove test coverage duplication and redundancy.

Answer: B


NEW QUESTION # 35
Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?

  • A. It allows specify test cases without being closely tied to the tool to run them against the SUT
  • B. It allows testers to find more defects on the SUT
  • C. It allow choosing different paradigms (e.g event-driven) for the interaction TAS and SUT
  • D. It allows developing steps of the test process without being closely tied to the SUT interface.

Answer: A


NEW QUESTION # 36
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

  • A. Take a backup of the database in its current state. So It can be analyzed later
  • B. Re-run the test automation suite starting from the 12th test
  • C. Return the database to a consistent state that allows subsequent test to run
  • D. Re-run the test automation suite starting from the 1st test.

Answer: A


NEW QUESTION # 37
Which of the following describes how a test execution report is likely to be used?

  • A. To understand which test step caused the failure in a test case
  • B. To identify problematic areas of the SUT by keeping a history showing which test cases fail the most
  • C. To measure coverage of the test basis by a test suite
  • D. To record how a test case failure has been fixed

Answer: B


NEW QUESTION # 38
A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.
Which statement BEST describes a reason why this defect could re-occur in future releases?

  • A. Automated defect confirmation testing is not effective at confirming that the resolved defect will continue to work in future releases
  • B. The automated regression test suite is not run consistently for future releases.
  • C. The configuration management process does not properly control the synchronization between software archives
  • D. The automated regression test suite has a narrower scope of functionality

Answer: C


NEW QUESTION # 39
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).
What is the BEST recommendation for improving the TAS?

  • A. Implementing keywords with higher level of granularity
  • B. Implementing standard setup and teardown functions at test case level
  • C. Improving the architecture of the application in order to improve its testability
  • D. Adopting a set of standard verification methods for use by all automated tests

Answer: A


NEW QUESTION # 40
Consider the following layers of the gTAA structure:
a. Test generation layer
b. Test definition layer
c. Test execution layer
d. Test execution layer
Consider the following capabilities associated with these layers.
Acquire all the necessary resources before each test and release all after run, in order to avoid interdependences between test Allow the automated test scripts on an abstract level to interact with components, configurations and interfaces of the SUT.
Design test directives that allow configuring the algorithms used to automatically produce the test cases a given model of the SUT.
Allow the definition and implementation of test cases and data by means of templates and/or guidelines.
Which of the following BEST matches each layer with the appropriate capability?

  • A. a-3, b-4, c-2, d-1
  • B. a-4, b-3, c-1, d-2
  • C. a-4, b-3, c-2, d-1
  • D. a-3, b-4, c-1, d-2

Answer: C


NEW QUESTION # 41
......


The ISTQB CT-TAE certification exam is aimed at individuals who have a strong background in software testing and are looking to specialize in test automation. This certification is designed to test the candidate's knowledge and skills in test automation and to ensure that they have the necessary expertise to design, implement, and maintain automated tests. The exam is divided into different sections, each covering a specific aspect of test automation. The exam is multiple-choice and can be taken online or at an authorized testing center. Upon passing the exam, candidates will receive the ISTQB CT-TAE certification, which is recognized globally and can help to increase their career prospects in the software testing industry.

 

Verified CT-TAE dumps Q&As - 100% Pass from DumpsValid: https://www.dumpsvalid.com/CT-TAE-still-valid-exam.html

Latest 100% Exam Passing Ratio - CT-TAE Dumps PDF: https://drive.google.com/open?id=1UWAgo8O4Fl7ViHqGwx0dGfPq2Aw4vtBm