NEW QUESTION # 29
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning with final assembly (40)
  • B. Make-to-order production (20)
  • C. Planning at assembly level (70)
  • D. Production by lot size (30)

Answer: A

Explanation:
Planning with final assembly (40) is a planning strategy that supports the consumption of planned independent requirements for the semi-finished material. This strategy is used when the production of the finished product is triggered by the sales order, but the production of the semi-finished product is not. The semi-finished product is produced in advance based on the forecast and stored in stock. When the sales order is received, the planned independent requirements for the finished product are reduced by the sales order quantity, and the planned independent requirements for the semi-finished product are reduced by the corresponding component quantity. This way, the semi-finished product is consumed by the sales order and the production order for the finished product only requires the assembly of the components. This strategy allows for a shorter lead time and a higher flexibility for the finished product, while reducing the risk of excess stock for the semi-finished product. Reference: Planning with Final Assembly | SAP Help Portal, Planning Strategies | SAP Help Portal, SAP S/4HANA Production Planning and Manufacturing Certification Guide, page 53-54


NEW QUESTION # 30
Where does the system check master data selection settings during the creation of planned orders production orders? Note: There are 3 correct answers to this question.

  • A. In the bill of material (BOM)
  • B. In the work centers
  • C. In the routing
  • D. In the MRP controller
  • E. In the production version

Answer: A,C,D


NEW QUESTION # 31
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.

  • A. Operation duration
  • B. Planned delivery time
  • C. Total replenishment lead time
  • D. Inhouse production time

Answer: B,D


NEW QUESTION # 32
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. MRP creates a dependent requirement.
  • B. A sales order is delivered.
  • C. A sales order is created.
  • D. MRP creates a planned order.

Answer: C


NEW QUESTION # 33
How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.

  • A. Recipe approval
  • B. Digital signature
  • C. Approved resources
  • D. GMP-compliant flag
  • E. Batch record

Answer: A,B,E

Explanation:
To support a GMP-compliant production process, you can use the following features in SAP S/4HANA:
Digital signature: This allows you to electronically sign documents and transactions that are relevant for GMP compliance, such as production orders, process orders, batch records, and quality inspections. Digital signatures ensure the authenticity, integrity, and non-repudiation of the documents and transactions12.
Batch record: This is a document that records the entire production process of a batch, including the materials, resources, operations, quality data, and signatures involved. Batch records provide traceability and documentation for GMP compliance3 .
Recipe approval: This is a process that ensures that only approved recipes can be used for production. Recipes are approved by authorized users who sign them digitally. Recipe approval prevents unauthorized changes and ensures consistency and quality of the products .
Reference:
1: SAP Help Portal: Digital Signature
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: Product Compliance
3: SAP Help Portal: Batch Record
4: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: Product Compliance
5: SAP Help Portal: Recipe Approval
6: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 7: Process Orders


NEW QUESTION # 34
In your plant MRP is activated.
Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.

  • A. Use a specific MRP type.
  • B. Use a specific MRP list.
  • C. Use a specific material status.
  • D. Use a specific material group.

Answer: A,C


NEW QUESTION # 35
What options does a planner have in the planning table for repetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Dispatch operations to work centers.
  • B. Create new production quantities.
  • C. Change the assignments of production quantities to production lines.
  • D. Reschedule deallocate operations.

Answer: C,D


NEW QUESTION # 36
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

  • A. Planned order
  • B. Production order
  • C. Scheduling agreement schedule line
  • D. Purchase order

Answer: A,C


NEW QUESTION # 37
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.

  • A. They are only created for multilevel bill of material (BOM) structures.
  • B. They are created together with the independent requirement for the finished product.
  • C. They are created with exact times in Advanced Planning.
  • D. They are created on assembly level during the planning run.

Answer: C,D


NEW QUESTION # 38
What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.

  • A. Order type
  • B. Requirements type
  • C. Planning strategy
  • D. Requirements profile

Answer: B,C


NEW QUESTION # 39
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

  • A. Define the special procurement type inside the material BOM (bill of material).
  • B. Select a special MRP type inside the material master.
  • C. Select a special procurement type inside the material master.
  • D. Use a special item category in your material BOM (bill of material).

Answer: A,C


NEW QUESTION # 40
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward
  • B. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
  • C. The new operation is inserted at the desired time; the previous dispatched operation is moved forward.
  • D. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.

Answer: A

Explanation:
The graphical planning table is a tool for capacity planning and scheduling that displays the operations and the work centers in a time-oriented view. You can use the graphical planning table to create, change, or dispatch operations manually or automatically. The planning direction determines whether the operations are scheduled from the start date or the finish date of the order. If the planning direction is forward, the operations are scheduled from the start date of the order1.
If you want to insert an operation at a certain time on a work center in the graphical planning table, and the planning direction is forward, and the desired dispatching time coincides with an operation that has previously been dispatched, the insertion takes place as follows:
The new operation is inserted at the desired time; the previously dispatched operation is moved backward (B): This is the correct answer. The system inserts the new operation at the specified time and shifts the previously dispatched operation to a later time, so that the sequence and the capacity requirements of the operations are maintained. The system also adjusts the start and finish dates of the order and the subsequent operations accordingly2.
The other options are not correct for the following reasons:
The new operation is inserted at the desired time; the previous dispatched operation is moved forward (A): This is not correct. The system does not move the previously dispatched operation to an earlier time, as this would violate the planning direction and the capacity constraints of the work center. The system only moves the previously dispatched operation to a later time, as explained in option B.
The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation (C): This is not correct. The system does not insert the new operation after the previously dispatched operation, as this would not match the desired dispatching time specified by the user. The system inserts the new operation at the desired time and moves the previously dispatched operation backward, as explained in option B.
The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation (D): This is not correct. The system does not insert the new operation before the previously dispatched operation, as this would violate the planning direction and the capacity constraints of the work center. The system inserts the new operation at the desired time and moves the previously dispatched operation backward, as explained in option B.


NEW QUESTION # 41
What are the key features of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine how costs are rolled up by product costing
  • B. To determine the use of subitems inside material BOM (bill of material)
  • C. To determine the priority of alternative components inside ATP
  • D. To determine the sequence in which materials are planned in MRP

Answer: A,D


NEW QUESTION # 42
which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
Note: There are 3 Correct answers to this question.

  • A. Reduction of associated capacity requirements
  • B. posting of goods receipt for the product
  • C. Material staging for next order in sequence
  • D. Archiving of document for assembly scrap
  • E. Posting of production costs to the production cost collector

Answer: A,B,E

Explanation:
When you save a confirmation for a finished product in repetitive manufacturing, the system performs the following actions by default12:
Posting of production costs to the production cost collector: The system calculates the actual costs for the confirmed quantity and posts them to the production cost collector assigned to the product. The production cost collector is a cost object that collects the costs for all confirmations of a product in a plant for a period.
Posting of goods receipt for the product: The system posts the confirmed quantity as a goods receipt to the warehouse. The product is valuated at the standard price defined in the material master record. The difference between the standard price and the actual costs is posted to a price difference account.
Reduction of associated capacity requirements: The system reduces the capacity requirements for the work center where the confirmation was made. The capacity requirements are calculated based on the confirmed quantity and the standard values for setup, machine, and labor time in the routing. Reference: 1: Repetitive Manufacturing Confirmation | SAP Help Portal(https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/ee6ff9b281d8448f96b4fe6c89f2bdc8/66dd7fc2d4ac4a53b51f300a04ae24ac.html)2: Confirming Production in Repetitive Manufacturing | SAP Help Portal(https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/f899ce30af9044299d573ea30b533f1c/9231f9504a62eb5ee10000000a44538d.html).


NEW QUESTION # 43
You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?

  • A. Insert operation
  • B. Squeeze in
  • C. Find Slot
  • D. Schedule in working time only

Answer: C

Explanation:
The Find Slot scheduling strategy allows you to schedule an operation finitely, without removing other operations. It searches for a free slot in the resource's capacity that can accommodate the operation's duration and constraints. If no suitable slot is found, the operation is scheduled at the end of the resource's capacity. This strategy is useful for inserting urgent orders or operations into an existing schedule without disrupting it too much12 Reference:
SAP S/4HANA Manufacturing for planning and scheduling - SAP Community
SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide


NEW QUESTION # 44
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Production version
  • C. Routing
  • D. Material master

Answer: A,C


NEW QUESTION # 45
What are the options if the Dispatched operation status is set for a production order operation? Note:
There are 2 correct answers to this question.

  • A. You can reschedule the operation in the Manage Work Center Capacity app.
  • B. You can reschedule the operation using infinite scheduling in a planning table.
  • C. You can reschedule the operation using finite scheduling in a planning table.
  • D. You can reschedule the operation using lead time scheduling.

Answer: A,C


NEW QUESTION # 46
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

  • A. The quantity and value updates are the same
  • B. The same base unit of measure is used.
  • C. The same batch management level is used
  • D. The same account category is used

Answer: A,B

Explanation:
You can change the material type for a material if stocks, reservations, or purchasing documents exist only if the following conditions are met:
The same base unit of measure is used. This ensures that the material quantity is consistent across different material types.
The quantity and value updates are the same. This ensures that the material valuation is consistent across different material types.
The material is not subject to split valuation. This ensures that the material has only one valuation class and price control. Reference: [SAP Help Portal] - Change Material Type


NEW QUESTION # 47
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements
  • C. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • D. An evaluation to verify if there are material or capacity shortages in the ^ network after the production planning run

Answer: A

Explanation:
Pegging is a term used in Advanced Planning to describe the relationship between the receipt and the issue elements of a product within a location. Receipt elements are planning elements that increase the stock of a product, such as production orders, purchase orders, or stock transfers. Issue elements are planning elements that reduce the stock of a product, such as sales orders, planned independent requirements, or reservations. Pegging links the receipt and issue elements according to the bill-of-material structure of all related products and represents the material flow through all levels of production. Pegging enables the system to identify and display quantity and date/time problems, such as shortages or delays, and to forward scheduling changes to other dependent elements. Pegging also forms the basis for the availability check and the capacity check in Advanced Planning12.
Reference:
1: SAP Help Portal: Pegging
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 4: Advanced Planning


NEW QUESTION # 48
Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.

  • A. To save multiple changes for an object
  • B. To monitor document object changes
  • C. To monitor document table changes
  • D. To enable integration into a sales order

Answer: A,B


NEW QUESTION # 49
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

  • A. Resource selection
  • B. Resource network
  • C. Resource matrix
  • D. Resource hierarchy

Answer: A,B

Explanation:
A resource network is a business object in PP/DS that defines the allowed directed connections between two or more resources. A directed connection means that the connection from Resource 1 to Resource 2 is not the same as the inverse connection from Resource 2 to Resource 1. You use this object to model existing production constraints more precisely, with the objective of creating a finite and technically feasible production schedule. Resource networks simplify the modeling of resource restrictions for consecutive operations or orders1 A resource selection is a business object in PP/DS that defines the criteria for selecting a suitable resource for an operation or an order. You use this object to specify the characteristics, attributes, and capacities of the resources that can be used for a particular production process. Resource selection allows you to optimize the resource utilization and reduce the setup times and costs2 A resource matrix is a business object in PP/DS that defines the relationships between different resources based on their characteristics and attributes. You use this object to determine the setup times and costs for changing from one resource to another. Resource matrix allows you to model the setup effort and expense more accurately and improve the production efficiency3 A resource hierarchy is a business object in PP/DS that defines the structure and sequence of resources that are used for a production process. You use this object to represent the logical and physical dependencies of the resources and to control the scheduling and sequencing of the operations or orders. Resource hierarchy allows you to model the production flow and capacity more realistically and ensure the technical feasibility of the production plan.
Reference:
Resource Network | SAP Help Portal
Resource Selection | SAP Help Portal
Resource Matrix | SAP Help Portal
[Resource Hierarchy | SAP Help Portal]


NEW QUESTION # 50
You want to reduce planning efforts for B C classified materials. Which planning procedure do you recommend?

  • A. Material Requirements Planning
  • B. Subassembly Planning
  • C. Consumption Based Planning
  • D. Advanced Planning

Answer: C


NEW QUESTION # 51
You are trying to create a production order NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

  • A. NO production lines are assigned to the production versions.
  • B. The order lot size is NOT within the validity range of a production version.
  • C. NO bills of material (BOMs) are assigned to the production versions.
  • D. All production versions for the material are locked.

Answer: B,D


NEW QUESTION # 52
......